Tuesday, September 14, 2010

To be honest, we're tired...

I guess the title says it all. We are tired, but still had a productive day.

David Krahn installing the in-floor hydronic heating.

Me installing a switch box. (See our older daughter Hayleigh, to the left in the back, walking our puppy in the new house!)

David Parker, Richard, and Randy Hildebrand drywalling the ceiling upstairs. The electrical inspector came by and gave us permission to do a lot of the drywall upstairs, so that was sure a blessing! We STILL are waiting for the electrical service hookup, and have done ALL the work so far using our neighbors outdoor outlet and LOTS of cordless drills, saws etc. PRAISE GOD that though we barely know our future neighbor he has been SO kind to allow us to plug our cords into his outlet.

PLEASE PRAY for the following:
  • Electrical hookup to be SOON!
  • Boiler installation to go smoothly.
  • Strength for us all.

1 comment:

  1. 2 Chronicles 15:7 says: "Be ye strong therefore, and let not your hands be weak: for your work shall be rewarded." Praying for you all!

    ReplyDelete